Back to Work

Now that Bend is finally starting to thaw from our massive Winter Blast work can resume at the Whitewater Park. Crews are scheduled to continue the reconstruction efforts next week as long as the weather holds. The passageway side will be dredged for safety and most importantly for River Surfers, the cement shoulders will be widened in the Whitewater Channel above and bellow the green wave to improve wave shape and safety downstream. The combination of these modifications with our near record-level snowpack should result in an epic River Surfing Season in Bend this Spring.